ITAC Assessment: MZ0142
ITAC logo
ITAC Assessment: MZ0142
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product machine tools
NAICS 333517: Machine Tool Manufacturing
SIC 3541: Machine Tools, Metal Cutting Types
Sales Range $50
M
to 100
M
# of Employees 250
Plant Area 208,000
ft2
Annual Production 450
pieces
Production Hrs. Annual 7,350
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $873,498 19,294,880
kWh
Electricity Demand $293,438 51,654
kW-mo/yr
Natural Gas $174,213 30,208
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,156 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,435

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1223: Install smaller boiler (increase high fire duty cycle) $5,862 $6,500 - - $5,862
-
MMBtu
02 2.2437: Recover waste heat from equipment $505 $1,000 - - $505
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $2,716 $2,500 $2,254
49,759
kWh
$462
-
kW-mo/yr
-
04 2.2511: Insulate bare equipment $206 $720 - - $206
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $10,435 $31,000 $8,662
191,210
kWh
$1,773
-
kW-mo/yr
-
06 2.7134: Use photocell controls $1,432 $980 $1,432
31,609
kWh
- -
TOTAL RECOMMENDED $21,156 $42,700 $12,348
272,578
kWh
$2,235
-
kW-mo/yr
$6,573
-
MMBtu
TOTAL IMPLEMENTED $10,435 $31,000 $8,662
191,210
kWh
$1,773
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs