| Assessment Year | 2014 |
|---|---|
| Principal Product | machine tools |
| NAICS | 333517: Machine Tool Manufacturing |
| SIC | 3541: Machine Tools, Metal Cutting Types |
| Sales Range | $50 M to 100M |
| # of Employees | 250 |
| Plant Area |
208,000
ft2
|
| Annual Production | 450
pieces
|
| Production Hrs. Annual | 7,350
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $873,498 | 19,294,880 |
kWh
|
$0.045 |
| Electricity Demand | $293,438 | 51,654 |
kW-mo/yr
|
$5.68 |
| Natural Gas | $174,213 | 30,208 |
MMBtu
|
$5.77 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $21,156 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,435 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.1223: Install smaller boiler (increase high fire duty cycle) | $5,862 | $6,500 | - | - |
$5,862
-
MMBtu
|
|
| 02 | 2.2437: Recover waste heat from equipment | $505 | $1,000 | - | - |
$505
-
MMBtu
|
|
| 03 | 2.4221: Install compressor air intakes in coolest locations | $2,716 | $2,500 |
$2,254
49,759
kWh
|
$462
-
kW-mo/yr
|
- | |
| 04 | 2.2511: Insulate bare equipment | $206 | $720 | - | - |
$206
-
MMBtu
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,435 | $31,000 |
$8,662
191,210
kWh
|
$1,773
-
kW-mo/yr
|
- | |
| 06 | 2.7134: Use photocell controls | $1,432 | $980 |
$1,432
31,609
kWh
|
- | - | |
| TOTAL RECOMMENDED | $21,156 | $42,700 |
$12,348
272,578
kWh
|
$2,235
-
kW-mo/yr
|
$6,573
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $10,435 | $31,000 |
$8,662
191,210
kWh
|
$1,773
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs