| Assessment Year | 2020 |
|---|---|
| Principal Product | Asphalt Paving Material |
| NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
| SIC | 2951: Asphalt Paving Mixtures and Blocks |
| Sales Range | less than $500 k |
| # of Employees | 32 |
| Plant Area |
100,000
ft2
|
| Annual Production | 1,300,000
ton
|
| Production Hrs. Annual | 3,570
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $525,278 | 6,378,020 |
kWh
|
$0.082 |
| Electricity Demand | $157,633 | 34,300 |
kW-mo/yr
|
$4.60 |
| Electricity Fees | $9,926 | - |
|
- |
| TOTAL YEARLY COSTS | $692,837 | |||
| RECOMMENDED SAVINGS* | $169,586 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $125,419 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.8114: Change rate schedules or other changes in utility service | $118,609 | $10,790 |
$111,716
-
kWh
|
$10,869
-
kW-mo/yr
|
$(-3,976.0) | - | |
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $41,944 | $27,312 |
$34,270
428,370
kWh
|
$7,674
-
kW-mo/yr
|
- | - | |
| 03 | 3.4154: Eliminate leaks in water lines and valves | $2,602 | $272 |
$2,125
26,558
kWh
|
$477
-
kW-mo/yr
|
- | - | |
| 04 | 2.7272: Install heat pipes / raise cooling setpoint | $2,344 | $36 |
$2,299
28,748
kWh
|
$45
-
kW-mo/yr
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,864 | $7,653 |
$1,892
23,655
kWh
|
$113
-
kW-mo/yr
|
- | $(-141.0) | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,828 | $3,940 |
$1,368
17,104
kWh
|
$460
-
kW-mo/yr
|
- | - | |
| 07 | 2.7135: Install occupancy sensors | $395 | $1,840 |
$395
4,935
kWh
|
- | - | - | |
| TOTAL RECOMMENDED | $169,586 | $51,843 |
$154,065
529,370
kWh
|
$19,638
-
kW-mo/yr
|
$(-3,976.0) | $(-141.0) | ||
| TOTAL IMPLEMENTED | $125,419 | $18,751 |
$118,032
78,961
kWh
|
$11,504
-
kW-mo/yr
|
$(-3,976.0) | $(-141.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs