ITAC Assessment: MA0563
ITAC logo
ITAC Assessment: MA0563
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Custom yachts
NAICS 336612: Boat Building
SIC 3732: Boat Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 79,000
ft2
Annual Production 1
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,548 531,879
kWh
Electricity Demand $11,731 1,837
kW-mo/yr
Electricity Fees $842 -
Fuel Oil #2 $40,379 5,147
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,692 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,435

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Personnel Changes Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $39,550 $12,000 $(-171.0)
(-2,800)
kWh
$1,221
-
MMBtu
$38,500
02 2.7224: Reduce space conditioning during non-working hours $1,769 $650 - $1,769
-
MMBtu
-
03 2.7135: Install occupancy sensors $257 $155 $257
2,200
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $116 - $116
1,900
kWh
- -
TOTAL RECOMMENDED $41,692 $12,805 $202
1,300
kWh
$2,990
-
MMBtu
$38,500
TOTAL IMPLEMENTED $41,435 $12,650 $(-55.0)
(-900)
kWh
$2,990
-
MMBtu
$38,500
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs