ITAC Assessment: UM0363
ITAC logo
ITAC Assessment: UM0363
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Fuel Fittings, Custom Fittings, Machined Parts, Plastic Injection Molded
NAICS 333249: Other Industrial Machinery Manufacturing
SIC 3492: Fluid Power Valves and Hose Fittings
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 90,000
ft2
Annual Production 1
units
Production Hrs. Annual 5,125
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $249,959 3,151,300
kWh
Electricity Demand $30,675 9,586
kW-mo/yr
Natural Gas $33,108 3,057
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,845 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,537

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $10,083 $500 - - $10,083
-
MMBtu
02 2.2437: Recover waste heat from equipment $9,498 $10,000 - - $9,498
-
MMBtu
03 2.2437: Recover waste heat from equipment $7,516 $500 - - $7,516
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $6,792 $200 $6,206
78,246
kWh
$586
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $2,241 $1,000 $2,049
25,833
kWh
$192
-
kW-mo/yr
-
06 2.2511: Insulate bare equipment $2,173 $1,375 - - $2,173
-
MMBtu
07 2.2437: Recover waste heat from equipment $542 $1,568 - - $542
-
MMBtu
TOTAL RECOMMENDED $38,845 $15,143 $8,255
104,079
kWh
$778
-
kW-mo/yr
$29,812
-
MMBtu
TOTAL IMPLEMENTED $24,537 $14,443 $2,049
25,833
kWh
$192
-
kW-mo/yr
$22,296
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs