Assessment Year | 1993 |
---|---|
Principal Product | ALUMINUM CASTINGS |
NAICS |
n/a
|
SIC | 3365: Aluminum Foundries |
Sales Range | $1 M to 5M |
# of Employees | 20 |
Plant Area |
n/a
|
Annual Production | 300,000
pieces
|
Production Hrs. Annual | 2,340
hrs
|
Location (State) | Arizona |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $84,615 | 822,392 |
kWh
|
$0.10 |
Natural Gas | $7,258 | 2,171 |
MMBtu
|
$3.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,311 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $969 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $194 | - |
$239
2,345
kWh
|
- | $(-45.0) | |
02 | 2.7135: Install occupancy sensors | $202 | $350 |
$202
2,052
kWh
|
- | - | |
03 | 2.4133: Use most efficient type of electric motors | $107 | $235 |
$107
879
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $580 | $250 |
$580
5,569
kWh
|
- | - | |
05 | 2.4314: Use synthetic lubricant | $1,447 | $4,776 |
$633
6,155
kWh
|
- | $814 | |
06 | 2.2522: Isolate hot or cold equipment | $389 | - |
$389
3,810
kWh
|
- | - | |
07 | 2.2136: Install / repair insulation on steam lines | $149 | $129 | - |
$149
-
MMBtu
|
- | |
08 | 2.2414: Use waste heat from hot flue gases to preheat | $394 | $1,400 | - |
$394
-
MMBtu
|
- | |
09 | 2.2121: Increase amount of condensate returned | $1,776 | $500 | - |
$1,776
-
MMBtu
|
- | |
10 | 2.1213: Direct warmest air to combustion intake | $374 | $345 | - |
$374
-
MMBtu
|
- | |
11 | 2.7447: Install vinyl strip / high speed / air curtain doors | $764 | $500 |
$193
1,758
kWh
|
$571
-
MMBtu
|
- | |
12 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $935 | $3,200 |
$935
9,086
kWh
|
- | - | |
TOTAL RECOMMENDED | $7,311 | $11,685 |
$3,278
31,654
kWh
|
$3,264
-
MMBtu
|
$769 | ||
TOTAL IMPLEMENTED | $969 | $250 |
$969
9,379
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs