ITAC Assessment: SF0381
ITAC logo
ITAC Assessment: SF0381
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Lawn Edging from Recycled Plastics
NAICS 333112: Lawn and Garden Tractor and Home Lawn and Garden Equipment Manufacturing
SIC 3524: Lawn and Garden Tractors and Home Lawn and Garden Equipment
Sales Range $5
M
to 10
M
# of Employees 25
Plant Area 139,392
ft2
Annual Production 12,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $350,481 2,814,709
kWh
Electricity Demand $52,188 11,244
kW-mo/yr
Electricity Fees $6,520 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,422 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,240

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2211: Use optimum temperature $2,152 - $2,152
17,282
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,764 $7,740 $13,764
110,539
kWh
-
03 2.2511: Insulate bare equipment $4,908 $3,317 $4,908
39,416
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $19,745 $23,088 $18,191
146,094
kWh
$1,554
-
kW-mo/yr
05 2.2511: Insulate bare equipment $2,633 $4,117 $2,226
17,877
kWh
$407
-
kW-mo/yr
06 2.7121: Utilize daylight whenever possible in lieu of artificial light $3,502 $6,175 $3,113
24,996
kWh
$389
-
kW-mo/yr
07 2.7135: Install occupancy sensors $841 $2,812 $696
5,591
kWh
$145
-
kW-mo/yr
08 2.4239: Eliminate or reduce compressed air usage $4,109 $14,000 $3,309
26,574
kWh
$800
-
kW-mo/yr
09 2.4224: Upgrade controls on compressors $6,768 $25,263 $6,768
54,355
kWh
-
TOTAL RECOMMENDED $58,422 $86,512 $55,127
442,724
kWh
$3,295
-
kW-mo/yr
TOTAL IMPLEMENTED $26,240 $32,075 $24,152
193,963
kWh
$2,088
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs