ITAC Assessment: SF0153
ITAC logo
ITAC Assessment: SF0153
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Canned Fruits
NAICS
n/a
SIC 2030:
Sales Range $50
M
to 100
M
# of Employees 1,500
Plant Area 500,000
ft2
Annual Production 500,000,000
lb
Production Hrs. Annual 1,584
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $376,035 10,390,973
kWh
Electricity Demand $165,873 21,526
kW-mo/yr
Natural Gas $463,141 214,036
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $224,635 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Water Consumption Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,127 $50 $992
27,550
kWh
$135
-
kW-mo/yr
- - - -
02 2.2135: Repair and eliminate steam leaks $1,107 $1,250 - - $1,107
-
MMBtu
- - -
03 2.4133: Use most efficient type of electric motors $2,947 $7,021 $2,316
63,892
kWh
$631
-
kW-mo/yr
- - - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,191 $5,404 $1,722
47,479
kWh
$469
-
kW-mo/yr
- - - -
05 3.5313: Increase amount of waste recovered for resale $42,254 - - - - - $42,254
-
lb
-
06 2.2121: Increase amount of condensate returned $21,972 $2,000 $6,949
942,849
kWh
- - $11,890
-
Tgal
- $3,133
-
Tgal
07 3.4111: Use closed cycle process to minimize waste water production $7,108 $399 $(-20.0)
(-293)
kWh
- - $4,762
-
Tgal
- $2,366
-
Tgal
08 3.4111: Use closed cycle process to minimize waste water production $1,183 $399 $(-20.0)
(-293)
kWh
- - $952
-
Tgal
- $251
-
Tgal
09 3.6193: Install equipment (eg compactor) to reduce disposal costs $144,746 $120,400 - - - - $144,746
-
lb
-
TOTAL RECOMMENDED $224,635 $136,923 $11,939
1,081,184
kWh
$1,235
-
kW-mo/yr
$1,107
-
MMBtu
$17,604
-
Tgal
$187,000
-
lb
$5,750
-
Tgal
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs