ITAC Assessment: SD0420
ITAC logo
ITAC Assessment: SD0420
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Server Cabinets and Cable Management Racks
NAICS 333517: Machine Tool Manufacturing
SIC 3542: Machine Tools, Metal Forming Types
Sales Range less than $500
k
# of Employees 115
Plant Area 67,000
ft2
Annual Production 160,000
pieces
Production Hrs. Annual 3,250
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,247 2,535,600
kWh
Electricity Demand $120,361 7,908
kW-mo/yr
Natural Gas $99,911 10,120
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,586 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $685

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7121: Utilize daylight whenever possible in lieu of artificial light $685 - $685
9,328
kWh
-
02 2.7135: Install occupancy sensors $383 $246 $383
5,216
kWh
-
03 2.7134: Use photocell controls $3,350 $4,950 $3,350
45,582
kWh
-
04 2.2614: Use cooling tower or economizer to replace chiller cooling $5,037 $3,000 $2,358
32,085
kWh
$2,679
-
kW-mo/yr
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,131 $3,573 $2,131
28,995
kWh
-
TOTAL RECOMMENDED $11,586 $11,769 $8,907
121,206
kWh
$2,679
-
kW-mo/yr
TOTAL IMPLEMENTED $685 - $685
9,328
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs