ITAC Assessment: NC0396
ITAC logo
ITAC Assessment: NC0396
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Conveyor rollers
NAICS 333922: Conveyor and Conveying Equipment Manufacturing
SIC 3535: Conveyors and Conveying Equipment
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 228,297
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 4,250
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,471 2,811,000
kWh
Electricity Demand $64,608 7,321
kW-mo/yr
Electricity Fees $3,040 -
LPG $7,091 415
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $150,997 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Ancillary Material Cost Savings
01 2.7232: Replace existing hvac unit with high efficiency model $76,612 $275,318 $23,560
427,281
kWh
$13,052
-
kW-mo/yr
- - $40,000
02 4.512: Condense operation into one building $31,185 $13,100 $20,537
362,468
kWh
$8,544
-
kW-mo/yr
- $2,104
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $37,090 $83,137 $26,319
475,983
kWh
$11,222
-
kW-mo/yr
- - $(-451.0)
04 2.7135: Install occupancy sensors $600 $558 $600
10,585
kWh
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $313 $132 $102
1,800
kWh
$80
-
kW-mo/yr
- - $131
06 2.4231: Reduce the pressure of compressed air to the minimum required $1,507 - $1,064
18,785
kWh
$443
-
kW-mo/yr
- - -
07 2.2437: Recover waste heat from equipment $3,690 $5,306 - - $3,690
-
MMBtu
- -
TOTAL RECOMMENDED $150,997 $377,551 $72,182
1,296,902
kWh
$33,341
-
kW-mo/yr
$3,690
-
MMBtu
$2,104
-
MMBtu
$39,680
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings LPG Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs