ITAC Assessment: KU0308
ITAC logo
ITAC Assessment: KU0308
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product ANIMAL HEALTH PRODUCTS
NAICS
n/a
SIC 2834: Pharmaceutical Preparations
Sales Range $50
M
to 100
M
# of Employees 170
Plant Area
n/a
Annual Production 24,500,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $312,086 5,779,895
kWh
Natural Gas $67,659 19,473
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,943 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $42,310

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $27,543 $23,000 $27,543
510,258
kWh
-
02 2.7262: Separate controls of air handlers from ac/ heating systems $7,309 $2,500 $7,309
135,404
kWh
-
03 2.6124: Establish equipment maintenance schedule $2,009 $250 $2,009
37,222
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $665 $80 $665
12,309
kWh
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,013 $1,600 $1,013
18,757
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $633 - $633
11,723
kWh
-
07 2.1123: Install automatic stack damper $2,280 $3,000 - $2,280
-
MMBtu
08 2.6121: Reduce hot water temperature to the minimum required $106 - - $106
-
MMBtu
09 2.2511: Insulate bare equipment $246 $165 - $246
-
MMBtu
10 2.4133: Use most efficient type of electric motors $1,139 $1,600 $1,139
21,102
kWh
-
TOTAL RECOMMENDED $42,943 $32,195 $40,311
746,775
kWh
$2,632
-
MMBtu
TOTAL IMPLEMENTED $42,310 $32,195 $39,678
735,052
kWh
$2,632
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs