| Assessment Year | 1990 |
|---|---|
| Principal Product | ANIMAL HEALTH PRODUCTS |
| NAICS |
n/a
|
| SIC | 2834: Pharmaceutical Preparations |
| Sales Range | $50 M to 100M |
| # of Employees | 170 |
| Plant Area |
n/a
|
| Annual Production | 24,500,000
lb
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $312,086 | 5,779,895 |
kWh
|
$0.054 |
| Natural Gas | $67,659 | 19,473 |
MMBtu
|
$3.47 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $42,943 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $42,310 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2621: Modify refrigeration system to operate at a lower pressure | $27,543 | $23,000 |
$27,543
510,258
kWh
|
- | |
| 02 | 2.7262: Separate controls of air handlers from ac/ heating systems | $7,309 | $2,500 |
$7,309
135,404
kWh
|
- | |
| 03 | 2.6124: Establish equipment maintenance schedule | $2,009 | $250 |
$2,009
37,222
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $665 | $80 |
$665
12,309
kWh
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,013 | $1,600 |
$1,013
18,757
kWh
|
- | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $633 | - |
$633
11,723
kWh
|
- | |
| 07 | 2.1123: Install automatic stack damper | $2,280 | $3,000 | - |
$2,280
-
MMBtu
|
|
| 08 | 2.6121: Reduce hot water temperature to the minimum required | $106 | - | - |
$106
-
MMBtu
|
|
| 09 | 2.2511: Insulate bare equipment | $246 | $165 | - |
$246
-
MMBtu
|
|
| 10 | 2.4133: Use most efficient type of electric motors | $1,139 | $1,600 |
$1,139
21,102
kWh
|
- | |
| TOTAL RECOMMENDED | $42,943 | $32,195 |
$40,311
746,775
kWh
|
$2,632
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $42,310 | $32,195 |
$39,678
735,052
kWh
|
$2,632
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs