ITAC Assessment: UD0428
ITAC logo
ITAC Assessment: UD0428
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product service station valves & pipe fittings
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 240,000
ft2
Annual Production 0
units
Production Hrs. Annual 7,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $319,465 6,646,249
kWh
Natural Gas $49,587 9,540
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,080 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,895

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $32,291 $75,000 $43,383
500,000
kWh
$(-11,092.0)
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,373 $2,400 $1,793
82,356
kWh
- $580
03 2.7142: Utilize higher efficiency lamps and/or ballasts $6,231 $46,256 $4,820
220,985
kWh
- $1,411
04 2.7142: Utilize higher efficiency lamps and/or ballasts $20,185 $57,200 $14,480
664,127
kWh
- $5,705
TOTAL RECOMMENDED $61,080 $180,856 $64,476
1,467,468
kWh
$(-11,092.0)
-
MMBtu
$7,696
TOTAL IMPLEMENTED $40,895 $123,656 $49,996
803,341
kWh
$(-11,092.0)
-
MMBtu
$1,991
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs