ITAC Assessment: UD0793
ITAC logo
ITAC Assessment: UD0793
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Water Softeners
NAICS 333999: All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 91,000
ft2
Annual Production 2,500,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,467 2,741,900
kWh
Electricity Demand $91,815 7,704
kW-mo/yr
Natural Gas $12,830 1,017
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,085 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,635

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,450 $25,000 $5,439
159,956
kWh
$4,046
-
kW-mo/yr
- - $(-1,035.0) -
02 2.2511: Insulate bare equipment $6,677 $1,000 $3,829
112,608
kWh
$2,848
-
kW-mo/yr
- - - -
03 2.7243: Improve air circulation with destratification fans / other methods $3,960 $500 - - $3,960
-
MMBtu
- - -
04 2.3134: Shift from daytime to nighttime operation $3,855 - $3,855
25
kWh
- - - - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,799 $400 $2,313
68,034
kWh
$1,486
-
kW-mo/yr
- - - -
06 2.2614: Use cooling tower or economizer to replace chiller cooling $3,114 - $1,774
52,182
kWh
$1,340
-
kW-mo/yr
- - - -
07 3.4116: Meter recycled water (to reduce sewer charges) $2,970 $1,000 - - - $2,970
-
Tgal
- -
08 3.4114: Replace city water with recycled water via cooling tower $2,460 $2,500 - - - $2,460
-
Tgal
- -
09 2.4231: Reduce the pressure of compressed air to the minimum required $1,488 - $853
25,092
kWh
$635
-
kW-mo/yr
- - - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $1,256 $4,820 $539
15,863
kWh
$401
-
kW-mo/yr
- - $316 -
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $621 $1,000 $2,122
62,424
kWh
$1,579
-
kW-mo/yr
- - $(-2,880.0) $(-200.0)
12 2.2625: Chill water to the highest temperature possible $435 - $250
7,344
kWh
$185
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $39,085 $36,220 $20,974
503,528
kWh
$12,520
-
kW-mo/yr
$3,960
-
MMBtu
$5,430
-
Tgal
$(-3,599.0) $(-200.0)
TOTAL IMPLEMENTED $29,635 $30,500 $17,872
412,287
kWh
$10,448
-
kW-mo/yr
- $5,430
-
Tgal
$(-3,915.0) $(-200.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs