ITAC Assessment: LE0454
ITAC logo
ITAC Assessment: LE0454
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Plastic films
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 84
Plant Area 100,000
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $505,226 12,232,800
kWh
Electricity Demand $57,906 22,735
kW-mo/yr
Electricity Fees $262,559 -
Natural Gas $61,017 6,725
MMBtu
TOTAL YEARLY COSTS $886,708
RECOMMENDED SAVINGS* $80,770 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $58,689

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,723 $1,500 $5,343
130,308
kWh
$380
-
kW-mo/yr
-
02 2.4221: Install compressor air intakes in coolest locations $554 $300 $509
12,402
kWh
$46
-
kW-mo/yr
-
03 2.2614: Use cooling tower or economizer to replace chiller cooling $40,361 $48,000 $37,780
921,473
kWh
$2,581
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,821 $20,500 $11,970
291,940
kWh
$852
-
kW-mo/yr
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,855 $8,000 $4,534
110,583
kWh
$321
-
kW-mo/yr
-
06 2.7233: Use properly designed and sized hvac equipment $9,261 $28,000 - - $9,261
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $6,301 $23,000 $5,786
141,120
kWh
$515
-
kW-mo/yr
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $895 $4,400 $895
21,840
kWh
- -
TOTAL RECOMMENDED $80,770 $133,700 $66,815
1,629,666
kWh
$4,695
-
kW-mo/yr
$9,261
-
MMBtu
TOTAL IMPLEMENTED $58,689 $85,200 $54,846
1,337,726
kWh
$3,843
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs