ITAC Assessment: KU0530
ITAC logo
ITAC Assessment: KU0530
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product wood windows
NAICS
n/a
SIC 2431: Millwork
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 140,800
ft2
Annual Production 47,500
pieces
Production Hrs. Annual 2,100
hrs
Location (State) Nebraska

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,758 1,070,926
kWh
Electricity Demand $36,814 4,826
kW-mo/yr
Natural Gas $29,584 6,383
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,110 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Product Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $6,910 $8,800 n/a $1,980
86,166
kWh
$4,930
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $900 $520 n/a $290
12,603
kWh
$610
-
kW-mo/yr
- - -
03 2.2437: Recover waste heat from equipment $620 $730 n/a - - $620
-
MMBtu
- -
04 4.513: Re-arrange equipment layout to reduce labor costs $55,080 $1,380 n/a - - - $55,080 -
05 4.424: Improve space comfort conditioning $11,600 $10,670 n/a - - - - $11,600
TOTAL RECOMMENDED $75,110 $22,100 $2,270
98,769
kWh
$5,540
-
kW-mo/yr
$620
-
MMBtu
$55,080 $11,600
TOTAL IMPLEMENTED - - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs