ITAC Assessment: ME0293
ITAC logo
ITAC Assessment: ME0293
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Asphalt Hot-mix & Crushed Stone
NAICS
n/a
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 170,000
ton
Production Hrs. Annual 2,484
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $239,414 2,587,046
kWh
Electricity Demand $56,990 9,905
kW-mo/yr
Electricity Fees $4,001 -
Fuel Oil #2 $26,721 6,114
MMBtu
Other Energy $120,140 49,765
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $72,139 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,445

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Energy Savings Increase in Production Savings
01 2.5121: Redesign flow to minimize mass transfer length $19,379 $38,000 $15,009
169,402
kWh
$4,370
-
kW-mo/yr
- - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,138 $10,890 $15,138
155,334
kWh
- - - -
03 2.2511: Insulate bare equipment $4,661 $7,900 - - - $4,661
-
MMBtu
-
04 2.8114: Change rate schedules or other changes in utility service $2,183 - - $2,143
-
kW-mo/yr
$40 - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $262 $200 $201
2,052
kWh
$61
-
kW-mo/yr
- - -
06 4.114: Add/modify equipment to improve drying process $30,516 $15,070 - - - - $30,516
TOTAL RECOMMENDED $72,139 $72,060 $30,348
326,788
kWh
$6,574
-
kW-mo/yr
$40 $4,661
-
MMBtu
$30,516
TOTAL IMPLEMENTED $2,445 $200 $201
2,052
kWh
$2,204
-
kW-mo/yr
$40 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Energy Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs