ITAC Assessment: UA0075
ITAC logo
ITAC Assessment: UA0075
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Paper printing and packaging
NAICS 322121: Paper (except Newsprint) Mills
SIC 2621: Paper Mills
Sales Range $50
M
to 100
M
# of Employees 65
Plant Area 174,000
ft2
Annual Production 900,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $276,790 3,479,521
kWh
Natural Gas $28,263 2,304
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,346 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,706

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,801 $2,400 $3,536
44,400
kWh
$265 -
02 2.4231: Reduce the pressure of compressed air to the minimum required $8,710 $800 $8,102
100,145
kWh
$608 -
03 2.7261: Install timers and/or thermostats $7,097 $2,040 $3,648
45,599
kWh
$274 $3,175
-
MMBtu
04 2.2437: Recover waste heat from equipment $1,398 $2,039 - - $1,398
-
MMBtu
05 2.2515: Use optimum thickness insulation $362 $84 $337
4,007
kWh
$25 -
06 2.7135: Install occupancy sensors $808 $398 $752
9,403
kWh
$56 -
07 2.7231: Use radiant heater for spot heating $16,122 $8,865 - - $16,122
-
MMBtu
08 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,048 $930 $975
12,195
kWh
$73 -
TOTAL RECOMMENDED $39,346 $17,556 $17,350
215,749
kWh
$1,301 $20,695
-
MMBtu
TOTAL IMPLEMENTED $11,706 $4,838 $7,936
99,402
kWh
$595 $3,175
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings