Assessment Year | 2012 |
---|---|
Principal Product | Paper printing and packaging |
NAICS | 322121: Paper (except Newsprint) Mills |
SIC | 2621: Paper Mills |
Sales Range | $50 M to 100M |
# of Employees | 65 |
Plant Area |
174,000
ft2
|
Annual Production | 900,000
pieces
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $276,790 | 3,479,521 |
kWh
|
$0.080 |
Natural Gas | $28,263 | 2,304 |
MMBtu
|
$12.27 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $39,346 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,706 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,801 | $2,400 |
$3,536
44,400
kWh
|
$265 | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,710 | $800 |
$8,102
100,145
kWh
|
$608 | - | |
03 | 2.7261: Install timers and/or thermostats | $7,097 | $2,040 |
$3,648
45,599
kWh
|
$274 |
$3,175
-
MMBtu
|
|
04 | 2.2437: Recover waste heat from equipment | $1,398 | $2,039 | - | - |
$1,398
-
MMBtu
|
|
05 | 2.2515: Use optimum thickness insulation | $362 | $84 |
$337
4,007
kWh
|
$25 | - | |
06 | 2.7135: Install occupancy sensors | $808 | $398 |
$752
9,403
kWh
|
$56 | - | |
07 | 2.7231: Use radiant heater for spot heating | $16,122 | $8,865 | - | - |
$16,122
-
MMBtu
|
|
08 | 2.7121: Utilize daylight whenever possible in lieu of artificial light | $1,048 | $930 |
$975
12,195
kWh
|
$73 | - | |
TOTAL RECOMMENDED | $39,346 | $17,556 |
$17,350
215,749
kWh
|
$1,301 |
$20,695
-
MMBtu
|
||
TOTAL IMPLEMENTED | $11,706 | $4,838 |
$7,936
99,402
kWh
|
$595 |
$3,175
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs