ITAC Assessment: MA0542
ITAC logo
ITAC Assessment: MA0542
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Business forms
NAICS 326112: Plastics Packaging Film and Sheet (including Laminated) Manufacturing
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 146,000
ft2
Annual Production 52,000,000
lb
Production Hrs. Annual 6,200
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $849,046 10,953,500
kWh
Electricity Demand $143,159 24,547
kW-mo/yr
Electricity Fees $5,093 -
Fuel Oil #2 $119,273 18,694
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,177 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,080

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
01 2.3212: Optimize plant power factor $14,636 $22,869 - $14,636
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $13,600 $21,400 $13,600
185,400
kWh
- -
03 2.7314: Reduce ventilation air $9,202 $3,400 $5,738
76,500
kWh
- $3,464
-
MMBtu
04 2.2691: Shut off cooling if cold outside air will cool process $8,465 - $8,465
110,800
kWh
- -
05 2.6218: Turn off equipment when not in use $4,383 - $4,383
49,900
kWh
- -
06 2.7224: Reduce space conditioning during non-working hours $2,232 $500 - - $2,232
-
MMBtu
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,659 $3,400 $1,659
18,900
kWh
- -
TOTAL RECOMMENDED $54,177 $51,569 $33,845
441,500
kWh
$14,636
-
kW-mo/yr
$5,696
-
MMBtu
TOTAL IMPLEMENTED $15,080 $500 $12,848
160,700
kWh
- $2,232
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs