Assessment Year | 2003 |
---|---|
Principal Product | Business forms |
NAICS | 326112: Plastics Packaging Film and Sheet (including Laminated) Manufacturing |
SIC | 2671: Packaging Paper and Plastics Film, Coated and Laminated |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
146,000
ft2
|
Annual Production | 52,000,000
lb
|
Production Hrs. Annual | 6,200
hrs
|
Location (State) | New Hampshire |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $849,046 | 10,953,500 |
kWh
|
$0.078 |
Electricity Demand | $143,159 | 24,547 |
kW-mo/yr
|
$5.83 |
Electricity Fees | $5,093 | - |
|
- |
Fuel Oil #2 | $119,273 | 18,694 |
MMBtu
|
$6.38 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $54,177 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,080 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $14,636 | $22,869 | - |
$14,636
-
kW-mo/yr
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $13,600 | $21,400 |
$13,600
185,400
kWh
|
- | - | |
03 | 2.7314: Reduce ventilation air | $9,202 | $3,400 |
$5,738
76,500
kWh
|
- |
$3,464
-
MMBtu
|
|
04 | 2.2691: Shut off cooling if cold outside air will cool process | $8,465 | - |
$8,465
110,800
kWh
|
- | - | |
05 | 2.6218: Turn off equipment when not in use | $4,383 | - |
$4,383
49,900
kWh
|
- | - | |
06 | 2.7224: Reduce space conditioning during non-working hours | $2,232 | $500 | - | - |
$2,232
-
MMBtu
|
|
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,659 | $3,400 |
$1,659
18,900
kWh
|
- | - | |
TOTAL RECOMMENDED | $54,177 | $51,569 |
$33,845
441,500
kWh
|
$14,636
-
kW-mo/yr
|
$5,696
-
MMBtu
|
||
TOTAL IMPLEMENTED | $15,080 | $500 |
$12,848
160,700
kWh
|
- |
$2,232
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs