Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1989
Principal Product DIAPERS (DISPOSABLE)
NAICS
n/a
SIC 2676: Sanitary Paper Products
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area
n/a
Annual Production 2,600,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $613,017 12,509,379
kWh
Natural Gas $26,128 4,459
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,918 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $40,898

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $10,020 $950 - $10,020
-
MMBtu
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $35,360 $30,765 $35,360
720,985
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $1,019 $900 $1,019
20,809
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,019 $400 $1,019
20,809
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,980 $3,350 $2,980
60,668
kWh
-
06 2.7226: Use computer programs to optimize hvac performance $520 $500 $520
24,033
kWh
-
TOTAL RECOMMENDED $50,918 $36,865 $40,898
847,304
kWh
$10,020
-
MMBtu
TOTAL IMPLEMENTED $40,898 $35,915 $40,898
847,304
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs