Assessment Year | 2009 |
---|---|
Principal Product | Heavy duty cam shafts |
NAICS | 333618: Other Engine Equipment Manufacturing |
SIC | 3519: Internal Combustion Engines, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 218 |
Plant Area |
177,000
ft2
|
Annual Production | 245,000
pieces
|
Production Hrs. Annual | 5,929
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,324,367 | 22,961,000 |
kWh
|
$0.058 |
Electricity Fees | $40,960 | - |
|
- |
Natural Gas | $746,162 | 92,460 |
MMBtu
|
$8.07 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $291,954 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $229,613 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $149,374 | $64,560 |
$144,883
2,511,840
kWh
|
$4,491 | - | - | - | |
02 | 2.2511: Insulate bare equipment | $74,110 | $7,510 | - | - |
$74,110
-
MMBtu
|
- | - | |
03 | 2.4239: Eliminate or reduce compressed air usage | $59,298 | $5,092 |
$57,515
997,146
kWh
|
$1,783 | - | - | - | |
04 | 2.7224: Reduce space conditioning during non-working hours | $5,010 | $1,350 |
$4,859
84,240
kWh
|
$151 | - | - | - | |
05 | 4.611: Begin a practice of predictive / preventative maintenance | $1,851 | $840 |
$340
5,888
kWh
|
$11 | - | - | $1,500 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,119 | $770 |
$422
7,323
kWh
|
$13 | - | $684 | - | |
07 | 2.6211: Conserve energy by efficient use of vending machines | $520 | $775 |
$504
8,736
kWh
|
$16 | - | - | - | |
08 | 2.7135: Install occupancy sensors | $291 | $180 |
$282
4,888
kWh
|
$9 | - | - | - | |
09 | 2.7111: Reduce illumination to minimum necessary levels | $381 | $120 |
$370
6,406
kWh
|
$11 | - | - | - | |
TOTAL RECOMMENDED | $291,954 | $81,197 |
$209,175
3,626,467
kWh
|
$6,485 |
$74,110
-
MMBtu
|
$684 | $1,500 | ||
TOTAL IMPLEMENTED | $229,613 | $74,190 |
$150,164
2,603,403
kWh
|
$4,655 |
$74,110
-
MMBtu
|
$684 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs