Assessment Year | 2010 |
---|---|
Principal Product | Automated Machine Tooling and Test Systems |
NAICS | 333519: Rolling Mill and Other Metalworking Machinery Manufacturing |
SIC | 3548: Electric and Gas Welding and Soldering Equipment |
Sales Range | $50 M to 100M |
# of Employees | 400 |
Plant Area |
218,000
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 3,276
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $125,053 | 2,929,440 |
kWh
|
$0.043 |
Electricity Demand | $111,840 | 8,320 |
kW-mo/yr
|
$13.44 |
Natural Gas | $134,522 | 11,142 |
MMBtu
|
$12.07 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $81,700 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $51,113 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7221: Lower temperature during the winter season and vice-versa | $27,064 | $1,500 | - | - |
$27,064
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $23,058 | $89,000 |
$10,709
250,847
kWh
|
$12,349
-
kW-mo/yr
|
- | |
03 | 2.2437: Recover waste heat from equipment | $12,351 | $500 | - | - |
$12,351
-
MMBtu
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,185 | $400 |
$2,846
66,660
kWh
|
$2,339
-
kW-mo/yr
|
- | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,961 | $3,048 | - | - |
$4,961
-
MMBtu
|
|
06 | 2.7135: Install occupancy sensors | $3,523 | $6,072 |
$3,523
82,532
kWh
|
- | - | |
07 | 2.7494: Install storm windows and doors | $3,301 | $3,000 | - | - |
$3,301
-
MMBtu
|
|
08 | 2.4221: Install compressor air intakes in coolest locations | $2,257 | $2,000 |
$1,230
28,804
kWh
|
$1,027
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $81,700 | $105,520 |
$18,308
428,843
kWh
|
$15,715
-
kW-mo/yr
|
$47,677
-
MMBtu
|
||
TOTAL IMPLEMENTED | $51,113 | $97,948 |
$14,785
346,311
kWh
|
$15,715
-
kW-mo/yr
|
$20,613
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs