Search Assessments
ITAC logo
Search Assessments
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
23 matching assessments
ARC 2+ Digits Required
NAICS Prefabricated metal building and component manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Year Products Rec's Plant Energy $/yr Rec'd Savings $/yr
WV0666 2024 Industrial metal buildings 6 $169k $19k
NL0081 2023 Drywall components 8 $156k $530k
UF0587 2022 Insulated panels 8 $348k $202k
SF0592 2022 Insulated panels 6 $393k $44k
UD1048 2022 Insulated metal panels 8 $147k $31k
MZ0310 2021 Prefabricated metal buildings 4 $126k $13k
AM0762 2018 Pre-fabricated metal buildings 8 $229k $89k
SF0473 2015 Pre-engineered metal buildings 9 $242k $173k
OK0899 2014 Metal building components 6 $168k $27k
AM0666 2014 Pre-fabricated mobile modules 8 $61k $23k
NC0487 2013 Fabricated steel 7 $48k $6.9k
BS0013 2012 Grain silos 6 $175k $9.9k
NC0404 2010 Fabricated steel buildings 4 $208k $10k
SF0379 2009 Engineered buildings 7 $166k $31k
OR0542 2008 Steel building components 6 $214k $155k
AM0548 2008 Fabricated metal buildings 9 $527k $131k
GT0826 2006 Dome structures 7 $206k $23k
BD0314 2006 Shade structures 8 $191k $26k
AM0510 2006 Metal buildings 11 $327k $40k
IA0386 2006 Hog confinement products 10 $166k $199k