ITAC Assessment: SF0379
ITAC logo
ITAC Assessment: SF0379
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product ENGINEERED BUILDINGS
NAICS 332311: Prefabricated Metal Building and Component Manufacturing
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 107,000
ft2
Annual Production 11,529
ton
Production Hrs. Annual 4,160
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $130,977 1,158,880
kWh
Electricity Demand $32,797 4,380
kW-mo/yr
Electricity Fees $1,435 -
Natural Gas $823 70
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,888 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,752

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,329 - $9,329
72,660
kWh
- -
02 2.4235: Remove or close off unneeded compressed air lines $909 - $909
7,076
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $2,136 $1,566 $1,760
13,710
kWh
$376
-
kW-mo/yr
-
04 2.7134: Use photocell controls $8,945 $5,833 $6,993
54,499
kWh
$1,952
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $3,347 $4,920 $2,646
20,605
kWh
$701
-
kW-mo/yr
-
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $803 $1,288 $1,122
8,736
kWh
$114
-
kW-mo/yr
$(-433.0)
-
MMBtu
07 2.7142: Utilize higher efficiency lamps and/or ballasts $5,419 $28,144 $4,369
34,027
kWh
$1,050
-
kW-mo/yr
-
TOTAL RECOMMENDED $30,888 $41,751 $27,128
211,313
kWh
$4,193
-
kW-mo/yr
$(-433.0)
-
MMBtu
TOTAL IMPLEMENTED $28,752 $40,185 $25,368
197,603
kWh
$3,817
-
kW-mo/yr
$(-433.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs