ITAC Assessment: OR0479
ITAC logo
ITAC Assessment: OR0479
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Butter
NAICS 311512: Creamery Butter Manufacturing
SIC 2021: Creamery Butter
Sales Range $10
M
to 50
M
# of Employees 22
Plant Area 58,000
ft2
Annual Production 18,000,000
lb
Production Hrs. Annual 5,928
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $77,870 1,728,760
kWh
Electricity Demand $18,797 51,264
kW-mo/yr
Electricity Fees $7,960 -
Natural Gas $67,274 9,232
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $144,980 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $142,780

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Primary Product Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $116,320 $115,000 - - $116,320
02 2.6218: Turn off equipment when not in use $19,750 $100 $3,320
74,922
kWh
$16,430
-
MMBtu
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $6,710 $800 - $6,710
-
MMBtu
-
04 2.2621: Modify refrigeration system to operate at a lower pressure $1,500 - $1,500
34,900
kWh
- -
05 2.2621: Modify refrigeration system to operate at a lower pressure $700 - $700
16,400
kWh
- -
TOTAL RECOMMENDED $144,980 $115,900 $5,520
126,222
kWh
$23,140
-
MMBtu
$116,320
TOTAL IMPLEMENTED $142,780 $115,900 $3,320
74,922
kWh
$23,140
-
MMBtu
$116,320
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs