Assessment Year | 2013 |
---|---|
Principal Product | Fabricated steel |
NAICS | 332311: Prefabricated Metal Building and Component Manufacturing |
SIC | 3448: Prefabricated Metal Buildings and Components |
Sales Range | $10 M to 50M |
# of Employees | 42 |
Plant Area |
50,000
ft2
|
Annual Production | 8,000,000
lb
|
Production Hrs. Annual | 3,500
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $29,322 | 377,100 |
kWh
|
$0.078 |
Electricity Demand | $1,103 | 1,551 |
kW-mo/yr
|
$0.71 |
Electricity Fees | $2,536 | - |
|
- |
Natural Gas | $14,844 | 1,725 |
MMBtu
|
$8.61 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $6,855 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,353 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,586 | $9,967 |
$3,944
48,510
kWh
|
$557
-
kW-mo/yr
|
- | - | $85 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $143 | $812 |
$126
1,544
kWh
|
$17
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $301 | $100 |
$382
4,700
kWh
|
$54
-
kW-mo/yr
|
- | $(-75.0) | $(-60.0) | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $323 | $840 |
$192
2,365
kWh
|
$11
-
kW-mo/yr
|
- | $120 | - | |
05 | 2.2437: Recover waste heat from equipment | $736 | $1,200 | - | - |
$736
-
MMBtu
|
- | - | |
06 | 2.7231: Use radiant heater for spot heating | $564 | $1,325 |
$544
6,699
kWh
|
$20
-
kW-mo/yr
|
- | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $202 | $50 |
$90
1,101
kWh
|
$112
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $6,855 | $14,294 |
$5,278
64,919
kWh
|
$771
-
kW-mo/yr
|
$736
-
MMBtu
|
$45 | $25 | ||
TOTAL IMPLEMENTED | $5,353 | $11,719 |
$4,644
57,119
kWh
|
$639
-
kW-mo/yr
|
- | $45 | $25 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs