ITAC Assessment: NC0487
ITAC logo
ITAC Assessment: NC0487
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Fabricated steel
NAICS 332311: Prefabricated Metal Building and Component Manufacturing
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 42
Plant Area 50,000
ft2
Annual Production 8,000,000
lb
Production Hrs. Annual 3,500
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,322 377,100
kWh
Electricity Demand $1,103 1,551
kW-mo/yr
Electricity Fees $2,536 -
Natural Gas $14,844 1,725
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,855 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,353

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,586 $9,967 $3,944
48,510
kWh
$557
-
kW-mo/yr
- - $85
02 2.7142: Utilize higher efficiency lamps and/or ballasts $143 $812 $126
1,544
kWh
$17
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $301 $100 $382
4,700
kWh
$54
-
kW-mo/yr
- $(-75.0) $(-60.0)
04 2.7142: Utilize higher efficiency lamps and/or ballasts $323 $840 $192
2,365
kWh
$11
-
kW-mo/yr
- $120 -
05 2.2437: Recover waste heat from equipment $736 $1,200 - - $736
-
MMBtu
- -
06 2.7231: Use radiant heater for spot heating $564 $1,325 $544
6,699
kWh
$20
-
kW-mo/yr
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $202 $50 $90
1,101
kWh
$112
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $6,855 $14,294 $5,278
64,919
kWh
$771
-
kW-mo/yr
$736
-
MMBtu
$45 $25
TOTAL IMPLEMENTED $5,353 $11,719 $4,644
57,119
kWh
$639
-
kW-mo/yr
- $45 $25
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs