ITAC Assessment: LL0332
ITAC logo
ITAC Assessment: LL0332
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Water treatment chemicals
NAICS 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 11
Plant Area 18,000
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,985 188,034
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $7,932 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,817

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,186 $1,815 $3,186
29,970
kWh
-
02 2.7224: Reduce space conditioning during non-working hours $3,014 $450 $3,014
28,350
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $658 $350 $354
3,329
kWh
$304
04 2.4231: Reduce the pressure of compressed air to the minimum required $477 $30 $477
4,485
kWh
-
05 2.6211: Conserve energy by efficient use of vending machines $372 $156 $372
3,495
kWh
-
06 2.7135: Install occupancy sensors $115 $300 $115
1,080
kWh
-
07 2.7111: Reduce illumination to minimum necessary levels $110 $90 $110
1,039
kWh
-
TOTAL RECOMMENDED $7,932 $3,191 $7,628
71,748
kWh
$304
TOTAL IMPLEMENTED $7,817 $2,891 $7,513
70,668
kWh
$304
Yearly Savings* Imp'd Cost* Electricity Usage Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs