Assessment Year | 2022 |
---|---|
Principal Product | Insulated Metal Panels |
NAICS | 332311: Prefabricated Metal Building and Component Manufacturing |
SIC | 3448: Prefabricated Metal Buildings and Components |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
150,000
ft2
|
Annual Production | 121,633
units
|
Production Hrs. Annual | 4,368
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $80,599 | 925,920 |
kWh
|
$0.087 | |
Electricity Demand | $19,474 | 2,782 |
kW-mo/yr
|
$7.00 | |
Electricity Fees | $113 | - |
|
- | |
Natural Gas | $23,976 | 2,449 |
MMBtu
|
$9.79 | |
LPG | $22,726 | 40 |
MMBtu
|
$568.15 | |
Waste Disposal Costs | |||||
Water Usage | $286 | 55 |
Tgal
|
$5.21 | |
Water Disposal | $10,861 | 55 |
Tgal
|
$198.16 | |
TOTAL YEARLY COSTS | $158,035 | ||||
RECOMMENDED SAVINGS* | $30,797 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $1,787 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7226: Use computer programs to optimize hvac performance | $15,150 | $1,500 | - | - |
$15,150
-
MMBtu
|
- | |
02 | 2.7135: Install occupancy sensors | $1,915 | $625 |
$1,026
11,794
kWh
|
$227
-
kW-mo/yr
|
- | $662 | |
03 | 2.7122: Disconnect ballasts | $1,787 | - |
$1,398
16,074
kWh
|
$310
-
kW-mo/yr
|
- | $79 | |
04 | 2.6218: Turn off equipment when not in use | $4,481 | $35 |
$4,481
51,505
kWh
|
- | - | - | |
05 | 2.4239: Eliminate or reduce compressed air usage | $4,115 | $1,409 |
$4,115
47,302
kWh
|
- | - | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,737 | $952 |
$1,564
17,982
kWh
|
$173
-
kW-mo/yr
|
- | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,039 | - |
$936
10,760
kWh
|
$103
-
kW-mo/yr
|
- | - | |
08 | 2.6226: Optimize filtration cleaning / replacement to minimize air resistance | $573 | $1,065 |
$469
5,396
kWh
|
$104
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $30,797 | $5,586 |
$13,989
160,813
kWh
|
$917
-
kW-mo/yr
|
$15,150
-
MMBtu
|
$741 | ||
TOTAL IMPLEMENTED | $1,787 | - |
$1,398
16,074
kWh
|
$310
-
kW-mo/yr
|
- | $79 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs