ITAC Assessment: UU0160
ITAC logo
ITAC Assessment: UU0160
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Bottled milk, cottage cheese, orange juice
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $1
M
to 5
M
# of Employees 300
Plant Area 92,350
ft2
Annual Production 10,500,000
lb
Production Hrs. Annual 8,720
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $520,234 15,818,880
kWh
Electricity Demand $410,617 30,215
kW-mo/yr
Electricity Fees $74,307 -
Natural Gas $270,305 74,100
MMBtu
Waste Disposal Costs
Water Usage $134,355 88,862
Tgal
Water Disposal $354,559 88,862
Tgal
Other Liquid (haz) $825,305 87,413,496
gal
TOTAL YEARLY COSTS $2,589,683
RECOMMENDED SAVINGS* $192,760 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $111,470

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings
01 2.2121: Increase amount of condensate returned $47,740 $212,490 - - $(-1,840.0) $28,990
-
MMBtu
$5,650
-
Tgal
$14,940
-
Tgal
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $41,050 $179,660 $26,240
795,110
kWh
$14,810
-
kW-mo/yr
- - - - -
03 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $30,330 $4,800 $25,050
759,060
kWh
$5,280
-
kW-mo/yr
- - - - -
04 3.4154: Eliminate leaks in water lines and valves $14,460 $13,100 - - - - $3,970
-
Tgal
$10,490
-
Tgal
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,220 $23,540 $5,160
156,390
kWh
$3,060
-
kW-mo/yr
- - - - -
06 2.4221: Install compressor air intakes in coolest locations $960 $1,140 $610
18,550
kWh
$350
-
kW-mo/yr
- - - - -
07 2.8124: Hire energy manager $50,000 $2,700 - - - - - - $50,000
TOTAL RECOMMENDED $192,760 $437,430 $57,060
1,729,110
kWh
$23,500
-
kW-mo/yr
$(-1,840.0) $28,990
-
MMBtu
$9,620
-
Tgal
$25,430
-
Tgal
$50,000
TOTAL IMPLEMENTED $111,470 $428,790 $31,400
951,500
kWh
$17,870
-
kW-mo/yr
$(-1,840.0) $28,990
-
MMBtu
$9,620
-
Tgal
$25,430
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Personnel Changes Savings