Assessment Year | 2022 |
---|---|
Principal Product | Insulated Panels |
NAICS | 332311: Prefabricated Metal Building and Component Manufacturing |
SIC | 3448: Prefabricated Metal Buildings and Components |
Sales Range | $100 M to 500M |
# of Employees | 100 |
Plant Area |
270,000
ft2
|
Annual Production | 11,000
thousand feet
|
Production Hrs. Annual | 6,188
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $242,342 | 2,450,378 |
kWh
|
$0.099 |
Electricity Demand | $95,180 | 8,184 |
kW-mo/yr
|
$11.63 |
Natural Gas | $55,124 | 3,042 |
MMBtu
|
$18.12 |
TOTAL YEARLY COSTS | $392,646 | |||
RECOMMENDED SAVINGS* | $43,814 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $43,814 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|
01 | 2.6212: Turn off equipment during breaks, reduce operating time | $8,569 | - |
$8,569
86,643
kWh
|
- | - | |
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $10,009 | - |
$10,009
101,207
kWh
|
- | - | |
03 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,682 | - |
$1,682
17,008
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,309 | $1,263 |
$870
8,801
kWh
|
$380
-
kW-mo/yr
|
$59 | |
05 | 2.2511: Insulate bare equipment | $13,506 | $24,333 |
$10,994
111,161
kWh
|
$2,512
-
kW-mo/yr
|
- | |
06 | 2.5195: Change product design to reduce energy requirements | $8,739 | $30,000 |
$8,739
88,364
kWh
|
- | - | |
TOTAL RECOMMENDED | $43,814 | $55,596 |
$40,863
413,184
kWh
|
$2,892
-
kW-mo/yr
|
$59 | ||
TOTAL IMPLEMENTED | $43,814 | $55,596 |
$40,863
413,184
kWh
|
$2,892
-
kW-mo/yr
|
$59 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs