ITAC Assessment: SF0592
ITAC logo
ITAC Assessment: SF0592
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Insulated Panels
NAICS 332311: Prefabricated Metal Building and Component Manufacturing
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $100
M
to 500
M
# of Employees 100
Plant Area 270,000
ft2
Annual Production 11,000
thousand feet
Production Hrs. Annual 6,188
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $242,342 2,450,378
kWh
Electricity Demand $95,180 8,184
kW-mo/yr
Natural Gas $55,124 3,042
MMBtu
TOTAL YEARLY COSTS $392,646
RECOMMENDED SAVINGS* $43,814 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,814

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings By-product Production Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $8,569 - $8,569
86,643
kWh
- -
02 2.6212: Turn off equipment during breaks, reduce operating time $10,009 - $10,009
101,207
kWh
- -
03 2.6212: Turn off equipment during breaks, reduce operating time $1,682 - $1,682
17,008
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,309 $1,263 $870
8,801
kWh
$380
-
kW-mo/yr
$59
05 2.2511: Insulate bare equipment $13,506 $24,333 $10,994
111,161
kWh
$2,512
-
kW-mo/yr
-
06 2.5195: Change product design to reduce energy requirements $8,739 $30,000 $8,739
88,364
kWh
- -
TOTAL RECOMMENDED $43,814 $55,596 $40,863
413,184
kWh
$2,892
-
kW-mo/yr
$59
TOTAL IMPLEMENTED $43,814 $55,596 $40,863
413,184
kWh
$2,892
-
kW-mo/yr
$59
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs