ITAC Assessment: IC0056
ITAC logo
ITAC Assessment: IC0056
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Organic Pigments
NAICS 325130: Synthetic Dye and Pigment Manufacturing
SIC 2865: Cyclic Organic Crudes and Intermediates, and Organic Dyes and Pigments
Sales Range $10
M
to 50
M
# of Employees 156
Plant Area 70,000
ft2
Annual Production 17,000,000
lb
Production Hrs. Annual 6,120
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,051,703 16,786,499
kWh
Electricity Demand $134,350 35,922
kW-mo/yr
Electricity Fees $23,568 -
Natural Gas $263,687 60,156
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,967 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,010 $16,443 $5,493
87,123
kWh
$442
-
kW-mo/yr
- $976 $99
02 2.7142: Utilize higher efficiency lamps and/or ballasts $11,363 $23,600 $10,508
166,790
kWh
$855
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $949 $3,982 $670
10,647
kWh
$209
-
kW-mo/yr
- $70 -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,063 $400 $1,846
29,310
kWh
$217
-
kW-mo/yr
- - -
05 2.4133: Use most efficient type of electric motors $4,571 $5,107 $4,094
64,981
kWh
$477
-
kW-mo/yr
- - -
06 2.2135: Repair and eliminate steam leaks $17,396 $3,500 - - $17,396
-
MMBtu
- -
07 2.1243: Use heat from boiler blowdown to preheat boiler feed water $7,043 $3,000 - - $7,043
-
MMBtu
- -
08 2.2136: Install / repair insulation on steam lines $3,180 $4,206 - - $3,180
-
MMBtu
- -
09 2.2136: Install / repair insulation on steam lines $1,770 $2,052 - - $1,770
-
MMBtu
- -
10 2.2511: Insulate bare equipment $2,293 $683 - - $2,293
-
MMBtu
- -
11 2.2511: Insulate bare equipment $1,329 $400 - - $1,329
-
MMBtu
- -
TOTAL RECOMMENDED $58,967 $63,373 $22,611
358,851
kWh
$2,200
-
kW-mo/yr
$33,011
-
MMBtu
$1,046 $99
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs