Assessment Year | 1999 |
---|---|
Principal Product | Tofu and Soy milk |
NAICS |
n/a
|
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
125,000
ft2
|
Annual Production | 25,000,000
lb
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $289,072 | 5,166,471 |
kWh
|
$0.056 |
Electricity Demand | $61,976 | 12,100 |
kW-mo/yr
|
$5.12 |
Electricity Fees | $32,193 | - |
|
- |
Natural Gas | $153,558 | 36,109 |
MMBtu
|
$4.25 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $165,563 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,899 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $160,542 | $811,250 |
$277,864
4,614,009
kWh
|
$26,833
-
kW-mo/yr
|
$(-104,155.0)
-
MMBtu
|
$(-40,000.0) | |
02 | 2.3212: Optimize plant power factor | $3,122 | $7,125 | - |
$3,122
-
kW-mo/yr
|
- | - | |
03 | 2.1213: Direct warmest air to combustion intake | $1,546 | $472 | - | - |
$1,546
-
MMBtu
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $353 | $1,090 |
$353
5,862
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $165,563 | $819,937 |
$278,217
4,619,871
kWh
|
$29,955
-
kW-mo/yr
|
$(-102,609.0)
-
MMBtu
|
$(-40,000.0) | ||
TOTAL IMPLEMENTED | $1,899 | $1,562 |
$353
5,862
kWh
|
- |
$1,546
-
MMBtu
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs