ITAC Assessment: MA0445
ITAC logo
ITAC Assessment: MA0445
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Tofu and Soy milk
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 125,000
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $289,072 5,166,471
kWh
Electricity Demand $61,976 12,100
kW-mo/yr
Electricity Fees $32,193 -
Natural Gas $153,558 36,109
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $165,563 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,899

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $160,542 $811,250 $277,864
4,614,009
kWh
$26,833
-
kW-mo/yr
$(-104,155.0)
-
MMBtu
$(-40,000.0)
02 2.3212: Optimize plant power factor $3,122 $7,125 - $3,122
-
kW-mo/yr
- -
03 2.1213: Direct warmest air to combustion intake $1,546 $472 - - $1,546
-
MMBtu
-
04 2.4221: Install compressor air intakes in coolest locations $353 $1,090 $353
5,862
kWh
- - -
TOTAL RECOMMENDED $165,563 $819,937 $278,217
4,619,871
kWh
$29,955
-
kW-mo/yr
$(-102,609.0)
-
MMBtu
$(-40,000.0)
TOTAL IMPLEMENTED $1,899 $1,562 $353
5,862
kWh
- $1,546
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs