ITAC Assessment: OK0899
ITAC logo
ITAC Assessment: OK0899
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Metal building components
NAICS 332311: Prefabricated Metal Building and Component Manufacturing
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $100
M
to 500
M
# of Employees 135
Plant Area 122,000
ft2
Annual Production 120,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,965 2,022,269
kWh
Electricity Demand $35,067 5,193
kW-mo/yr
Natural Gas $31,752 4,145
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,719 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,712

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,648 $3,905 $1,332
26,696
kWh
$316
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,062 $9,740 $2,062
41,315
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $506 $594 $506
10,150
kWh
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,496 $1,342 $3,496
70,060
kWh
- - -
05 2.8121: Apply for tax-free status for energy purchases $4,508 $140 - - - $4,508
06 2.5113: Use direct flame impingement or infrared processing for chamber type heating $14,499 $12,962 - - $14,499
-
MMBtu
-
TOTAL RECOMMENDED $26,719 $28,683 $7,396
148,221
kWh
$316
-
kW-mo/yr
$14,499
-
MMBtu
$4,508
TOTAL IMPLEMENTED $7,712 $15,581 $7,396
148,221
kWh
$316
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs