ITAC Assessment: OK0148
ITAC logo
ITAC Assessment: OK0148
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1984
Principal Product CHROMIUM PLATING
NAICS
n/a
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 30
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 3,640
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,188 839,977
kWh
Natural Gas $29,980 6,748
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,382 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,436

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $542 $500 - $542
-
MMBtu
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $596 $334 $596
12,309
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $318 $810 $183
3,517
kWh
- $135
04 2.2511: Insulate bare equipment $589 $291 - $589
-
MMBtu
-
05 2.2514: Cover open tanks $2,628 $555 - $2,628
-
MMBtu
-
06 2.2532: Use only amount of air necessary to prevent explosion hazard $5,709 $16,000 $(-605.0)
(-15,826)
kWh
$6,314
-
MMBtu
-
TOTAL RECOMMENDED $10,382 $18,490 $174
-
kWh
$10,073
-
MMBtu
$135
TOTAL IMPLEMENTED $7,436 $17,125 $(-9.0)
(-3,517)
kWh
$7,445
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs