ITAC Assessment: OK0946
ITAC logo
ITAC Assessment: OK0946
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Refurbished jet engine parts
NAICS 334511: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical System and Instrument Manufactur
SIC 3812: Search, Detection, Navigation, Guidance, Aeronautical, and Nautical Systems and Instruments
Sales Range $100
M
to 500
M
# of Employees 185
Plant Area 130,000
ft2
Annual Production 2,400
units
Production Hrs. Annual 5,631
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $331,127 7,809,600
kWh
Electricity Demand $231,180 19,210
kW-mo/yr
Electricity Fees $20,802 -
Natural Gas $22,252 2,694
MMBtu
TOTAL YEARLY COSTS $605,361
RECOMMENDED SAVINGS* $55,875 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,159

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $11,741 $14,041 $11,741
276,926
kWh
- -
02 2.6218: Turn off equipment when not in use $4,580 $10,160 $3,156
74,445
kWh
$1,424
-
kW-mo/yr
-
03 2.7311: Ventilation system to shut off when room is not in use $5,786 $2,872 $5,786
136,451
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $10,991 $5,865 $7,035
165,915
kWh
$3,956
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $11,039 $29,768 $6,879
162,229
kWh
$4,161
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,159 $7,320 $2,159
50,912
kWh
- -
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,353 - - $7,353
-
kW-mo/yr
-
08 2.8114: Change rate schedules or other changes in utility service $2,226 - - - $2,226
TOTAL RECOMMENDED $55,875 $70,026 $36,756
866,878
kWh
$16,893
-
kW-mo/yr
$2,226
TOTAL IMPLEMENTED $2,159 $7,320 $2,159
50,912
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs