ITAC Assessment: BS0013
ITAC logo
ITAC Assessment: BS0013
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Grain Silos
NAICS 332311: Prefabricated Metal Building and Component Manufacturing
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 264
Plant Area 94,760
ft2
Annual Production 20,250
ton
Production Hrs. Annual 4,320
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $125,419 1,754,360
kWh
Electricity Demand $35,907 5,969
kW-mo/yr
Electricity Fees $747 -
Natural Gas $13,145 1,602
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,853 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,560

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,038 $5,639 $1,672
23,391
kWh
$365
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $4,210 $20 $4,210
58,876
kWh
- -
03 2.4221: Install compressor air intakes in coolest locations $199 $250 $199
2,796
kWh
- -
04 2.7243: Improve air circulation with destratification fans / other methods $1,825 $22,200 $(-771.5)
(-10,790)
kWh
- $2,597
-
MMBtu
05 2.7221: Lower temperature during the winter season and vice-versa $312 $77 - - $312
-
MMBtu
06 2.7492: Use proper thickness of insulation on building envelope $1,270 $360 - - $1,270
-
MMBtu
TOTAL RECOMMENDED $9,853 $28,546 $5,309
74,273
kWh
$365
-
kW-mo/yr
$4,179
-
MMBtu
TOTAL IMPLEMENTED $6,560 $5,736 $5,882
82,267
kWh
$365
-
kW-mo/yr
$312
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs