Assessment Year | 2013 |
---|---|
Principal Product | Grain Silos |
NAICS | 332311: Prefabricated Metal Building and Component Manufacturing |
SIC | 3448: Prefabricated Metal Buildings and Components |
Sales Range | $10 M to 50M |
# of Employees | 264 |
Plant Area |
94,760
ft2
|
Annual Production | 20,250
ton
|
Production Hrs. Annual | 4,320
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $125,419 | 1,754,360 |
kWh
|
$0.071 |
Electricity Demand | $35,907 | 5,969 |
kW-mo/yr
|
$6.02 |
Electricity Fees | $747 | - |
|
- |
Natural Gas | $13,145 | 1,602 |
MMBtu
|
$8.21 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $9,853 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,560 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,038 | $5,639 |
$1,672
23,391
kWh
|
$365
-
kW-mo/yr
|
- | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,210 | $20 |
$4,210
58,876
kWh
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $199 | $250 |
$199
2,796
kWh
|
- | - | |
04 | 2.7243: Improve air circulation with destratification fans / other methods | $1,825 | $22,200 |
$(-771.5)
(-10,790)
kWh
|
- |
$2,597
-
MMBtu
|
|
05 | 2.7221: Lower temperature during the winter season and vice-versa | $312 | $77 | - | - |
$312
-
MMBtu
|
|
06 | 2.7492: Use proper thickness of insulation on building envelope | $1,270 | $360 | - | - |
$1,270
-
MMBtu
|
|
TOTAL RECOMMENDED | $9,853 | $28,546 |
$5,309
74,273
kWh
|
$365
-
kW-mo/yr
|
$4,179
-
MMBtu
|
||
TOTAL IMPLEMENTED | $6,560 | $5,736 |
$5,882
82,267
kWh
|
$365
-
kW-mo/yr
|
$312
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs