ITAC Assessment: UC2411
ITAC logo
ITAC Assessment: UC2411
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Printed circuit boards
NAICS 334418: Printed Circuit Assembly (Electronic Assembly) Manufacturing
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 35,000
ft2
Annual Production 100,000
units
Production Hrs. Annual 2,000
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,509 557,728
kWh
Electricity Demand $33,659 2,196
kW-mo/yr
Electricity Fees $6,376 -
Natural Gas $15,674 1,353
MMBtu
TOTAL YEARLY COSTS $105,218
RECOMMENDED SAVINGS* $27,967 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $962 - - - $962 - -
02 2.6212: Turn off equipment during breaks, reduce operating time $78 $100 $78
884
kWh
- - - -
03 2.9114: Use solar heat to make electricty $23,268 $223,076 $27,127
305,484
kWh
- - - $(-3,859.0)
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,065 $75 $861
9,697
kWh
$204
-
kW-mo/yr
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $572 $2,608 $572
6,439
kWh
- - - -
06 2.7491: Insulate glazing, walls, ceilings, and roofs $1,203 $1,779 $833
9,376
kWh
$370
-
kW-mo/yr
- - -
07 2.7261: Install timers and/or thermostats $819 $3,620 $73
819
kWh
- - $747
-
MMBtu
-
TOTAL RECOMMENDED $27,967 $231,258 $29,544
332,698
kWh
$574
-
kW-mo/yr
$962 $747
-
MMBtu
$(-3,859.0)
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs