Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Silk Screening of Shirts
NAICS
n/a
SIC 2369: Girls', Children's, and Infants' Outerwear, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 160
Plant Area 45,000
ft2
Annual Production 8,400,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,615 1,944,900
kWh
Natural Gas $44,711 7,857
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,514 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2515: Use optimum thickness insulation $5,290 $3,420 $5,290
183,470
kWh
-
02 2.7245: Use direct air supply to exhaust hoods $534 $2,465 $125
1,758
kWh
$409
-
MMBtu
03 2.2437: Recover waste heat from equipment $780 $1,800 - $780
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $16,910 $19,620 $16,910
248,535
kWh
-
TOTAL RECOMMENDED $23,514 $27,305 $22,325
433,763
kWh
$1,189
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs