ITAC Assessment: CI0058
ITAC logo
ITAC Assessment: CI0058
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Flat Glass
NAICS 327211: Flat Glass Manufacturing
SIC 3231: Glass Products, Made of Purchased Glass
Sales Range $50
M
to 100
M
# of Employees 429
Plant Area 149,410
ft2
Annual Production 50,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $881,719 7,777,655
kWh
Electricity Demand $1,195,177 29,042
kW-mo/yr
Electricity Fees $131,686 -
Natural Gas $601 36
MMBtu
LPG $31,167 1
MMBtu
Other Gas $232 1
MMBtu
Waste Disposal Costs
Water Usage $68,721 7,839
Tgal
Other Liquid (non-haz) $26,764 1
gal
TOTAL YEARLY COSTS $2,336,067
RECOMMENDED SAVINGS* $357,614 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $134,698 $652,406 $81,536
719,015
kWh
$53,162
-
kW-mo/yr
- -
02 4.652: Replace existing equipment with more suitable substitutes $96,000 $50,000 - - - $96,000
03 2.7134: Use photocell controls $48,465 $9,920 $16,940
149,386
kWh
$31,525
-
kW-mo/yr
- -
04 2.3141: Use battery storage for demand control $24,690 $40,000 - $24,690
-
kW-mo/yr
- -
05 2.1321: Replace fossil fuel equipment with electrical equipment $23,252 $78,000 $(-5,604.0)
(-49,421)
kWh
$(-2,311.0)
-
kW-mo/yr
$31,167
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $17,177 $17,556 $7,541
66,502
kWh
$4,954
-
kW-mo/yr
- $4,682
07 2.7232: Replace existing hvac unit with high efficiency model $10,295 $50,910 $10,295
90,784
kWh
- - -
08 2.2437: Recover waste heat from equipment $3,037 $14,840 $3,037
26,784
kWh
- - -
TOTAL RECOMMENDED $357,614 $913,632 $113,745
1,003,050
kWh
$112,020
-
kW-mo/yr
$31,167
-
MMBtu
$100,682
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs