ITAC Assessment: UF0587
ITAC logo
ITAC Assessment: UF0587
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Insulated Panels
NAICS 332311: Prefabricated Metal Building and Component Manufacturing
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 93
Plant Area 197,000
ft2
Annual Production 15,716,000
thousand feet
Production Hrs. Annual 5,616
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $145,388 2,049,157
kWh
Electricity Demand $58,978 9,328
kW-mo/yr
Electricity Fees $39,058 -
Natural Gas $68,095 9,374
MMBtu
LPG $36,612 1,374
MMBtu
Waste Disposal Costs
Water Usage $6,611 160,000
Tgal
Solid Waste (non-haz) $24,000 36,000
lb
TOTAL YEARLY COSTS $378,742
RECOMMENDED SAVINGS* $201,634 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,607

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Primary Product Savings
01 2.3417: Use waste heat with a closed-cycle gas turbine-generator set to cogenerate electricity and heat $133,034 $448,875 $178,358
2,512,079
kWh
$26,557
-
kW-mo/yr
$84,270
-
MMBtu
$(-156,151.0) -
02 2.2414: Use waste heat from hot flue gases to preheat $17,027 $20,000 - - $17,027
-
MMBtu
- -
03 2.3191: Use demand controller or load shedder $14,312 $11,024 $10,184
143,441
kWh
$4,128
-
kW-mo/yr
- - -
04 2.7425: Clean or color roof to reduce solar load $8,425 $36,450 $8,425
118,657
kWh
- - - -
05 2.4239: Eliminate or reduce compressed air usage $4,229 - $4,229
59,557
kWh
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,086 $356 $4,086
57,554
kWh
- - - -
07 4.424: Improve space comfort conditioning $15,247 $4,480 $(-5,794.0)
(-81,600)
kWh
$(-799.0)
-
kW-mo/yr
- - $21,840
08 3.5212: Regrind, reuse, or sell scrap plastic parts $5,274 - - - - $5,274 -
TOTAL RECOMMENDED $201,634 $521,185 $199,488
2,809,688
kWh
$29,886
-
kW-mo/yr
$101,297
-
MMBtu
$(-150,877.0) $21,840
TOTAL IMPLEMENTED $24,607 $4,836 $(-1,708.0)
(-24,046)
kWh
$(-799.0)
-
kW-mo/yr
- $5,274 $21,840
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs