ITAC Assessment: SF0611
ITAC logo
ITAC Assessment: SF0611
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Almonds
NAICS 311911: Roasted Nuts and Peanut Butter Manufacturing
SIC 2068: Salted and Roasted Nuts and Seeds
Sales Range greater than $500
M
# of Employees 250
Plant Area 252,000
ft2
Annual Production 438,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,407,697 14,445,517
kWh
Electricity Demand $379,609 34,187
kW-mo/yr
Natural Gas $1,229,723 126,184
MMBtu
TOTAL YEARLY COSTS $3,017,029
RECOMMENDED SAVINGS* $262,301 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $247,039

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $14,817 - $14,817
152,129
kWh
-
02 2.6218: Turn off equipment when not in use $4,908 - $4,908
50,394
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $61,975 $1,800 $61,975
639,299
kWh
-
04 2.4239: Eliminate or reduce compressed air usage $6,353 $2,100 $6,353
65,229
kWh
-
05 2.2441: Preheat boiler makeup water with waste process heat $8,909 $18,675 - $8,909
-
MMBtu
06 2.9114: Use solar heat to make electricty $165,339 $1,651,070 $165,339
1,697,522
kWh
-
TOTAL RECOMMENDED $262,301 $1,673,645 $253,392
2,604,573
kWh
$8,909
-
MMBtu
TOTAL IMPLEMENTED $247,039 $1,652,870 $247,039
2,539,344
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs