Assessment Year | 2016 |
---|---|
Principal Product | Couplings |
NAICS | 333613: Mechanical Power Transmission Equipment Manufacturing |
SIC | 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 200 |
Plant Area |
130,000
ft2
|
Annual Production | 1,578,118
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $494,829 | 6,606,543 |
kWh
|
$0.075 |
Electricity Fees | $60,868 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $157,180 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $26,459 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|
01 | 2.7241: Install outside air damper / economizer on hvac unit | $73,794 | $99,000 |
$70,630
942,996
kWh
|
$3,164 | |
02 | 2.7261: Install timers and/or thermostats | $25,593 | $4,000 |
$24,496
327,047
kWh
|
$1,097 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $40,306 | $65,413 |
$38,578
515,058
kWh
|
$1,728 | |
04 | 2.7134: Use photocell controls | $329 | $118 |
$315
4,199
kWh
|
$14 | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,753 | $100 |
$5,506
73,510
kWh
|
$247 | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,300 | $2,995 |
$5,073
67,734
kWh
|
$227 | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,568 | $5,780 |
$5,329
71,144
kWh
|
$239 | |
08 | 2.3132: Recharge batteries on during off-peak demand periods | $537 | - |
$514
-
kWh
|
$23 | |
TOTAL RECOMMENDED | $157,180 | $177,406 |
$150,441
2,001,688
kWh
|
$6,739 | ||
TOTAL IMPLEMENTED | $26,459 | $4,118 |
$25,325
331,246
kWh
|
$1,134 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs