Assessment Year | 2025 |
---|---|
Principal Product | Pre-engineered Metal Building |
NAICS | 332311: Prefabricated Metal Building and Component Manufacturing |
SIC | 3448: Prefabricated Metal Buildings and Components |
Sales Range | $100 M to 500M |
# of Employees | 147 |
Plant Area |
239,100
ft2
|
Annual Production | 31,200
ton
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $237,982 | 3,546,000 |
kWh
|
$0.067 | |
Electricity Demand | $158,875 | 10,569 |
kW-mo/yr
|
$15.03 | |
Electricity Fees | $21,517 | - |
|
- | |
Natural Gas | $115,290 | 13,263 |
MMBtu
|
$8.69 | |
Waste Disposal Costs | |||||
Water Usage | $1,910 | 220 |
Tgal
|
$8.70 | |
Water Disposal | $955 | 220 |
Tgal
|
$4.35 | |
Solid Waste (non-haz) | $8,670 | 301,565 |
lb
|
$0.029 | |
TOTAL YEARLY COSTS | $545,199 | ||||
RECOMMENDED SAVINGS* | $64,197 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $23,416 | $22,500 | - | $23,416 | - | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $9,066 | $25,950 |
$9,066
135,112
kWh
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $6,550 | $510 |
$6,550
97,606
kWh
|
- | - | - | |
04 | 2.7243: Improve air circulation with destratification fans / other methods | $5,946 | $26,000 |
$5,946
88,608
kWh
|
- | - | - | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $5,757 | $735 |
$5,757
85,800
kWh
|
- | - | - | |
06 | 2.2437: Recover waste heat from equipment | $4,891 | $5,000 | - | - |
$4,891
-
MMBtu
|
- | |
07 | 2.8121: Apply for tax-free status for energy purchases | $3,402 | $70 | - | - | - | $3,402 | |
08 | 2.6242: Minimize operation of equipment maintained in standby condition | $2,233 | $1,000 |
$2,233
33,283
kWh
|
- | - | - | |
09 | 2.7135: Install occupancy sensors | $2,091 | $5,800 |
$2,091
31,169
kWh
|
- | - | - | |
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $845 | $1,356 |
$845
12,604
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $64,197 | $88,921 |
$32,488
484,182
kWh
|
$23,416 |
$4,891
-
MMBtu
|
$3,402 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs