ITAC Assessment: TT0341
ITAC logo
ITAC Assessment: TT0341
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Pre-engineered Metal Building
NAICS 332311: Prefabricated Metal Building and Component Manufacturing
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $100
M
to 500
M
# of Employees 147
Plant Area 239,100
ft2
Annual Production 31,200
ton
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $237,982 3,546,000
kWh
Electricity Demand $158,875 10,569
kW-mo/yr
Electricity Fees $21,517 -
Natural Gas $115,290 13,263
MMBtu
Waste Disposal Costs
Water Usage $1,910 220
Tgal
Water Disposal $955 220
Tgal
Solid Waste (non-haz) $8,670 301,565
lb
TOTAL YEARLY COSTS $545,199
RECOMMENDED SAVINGS* $64,197 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.3212: Optimize plant power factor $23,416 $22,500 - $23,416 - -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,066 $25,950 $9,066
135,112
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,550 $510 $6,550
97,606
kWh
- - -
04 2.7243: Improve air circulation with destratification fans / other methods $5,946 $26,000 $5,946
88,608
kWh
- - -
05 2.6212: Turn off equipment during breaks, reduce operating time $5,757 $735 $5,757
85,800
kWh
- - -
06 2.2437: Recover waste heat from equipment $4,891 $5,000 - - $4,891
-
MMBtu
-
07 2.8121: Apply for tax-free status for energy purchases $3,402 $70 - - - $3,402
08 2.6242: Minimize operation of equipment maintained in standby condition $2,233 $1,000 $2,233
33,283
kWh
- - -
09 2.7135: Install occupancy sensors $2,091 $5,800 $2,091
31,169
kWh
- - -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $845 $1,356 $845
12,604
kWh
- - -
TOTAL RECOMMENDED $64,197 $88,921 $32,488
484,182
kWh
$23,416 $4,891
-
MMBtu
$3,402
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs