ITAC Assessment: TT0343
ITAC logo
ITAC Assessment: TT0343
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Pre-engineered Metal Buildings
NAICS 332311: Prefabricated Metal Building and Component Manufacturing
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $50
M
to 100
M
# of Employees 110
Plant Area 140,000
ft2
Annual Production 16,900
ton
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $340,953 2,920,608
kWh
Electricity Demand $108,795 8,384
kW-mo/yr
Natural Gas $110,031 13,276
MMBtu
Waste Disposal Costs
Water Usage $4,261 575
Tgal
Water Disposal $4,931 575
Tgal
TOTAL YEARLY COSTS $568,971
RECOMMENDED SAVINGS* $189,733 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 4.131: Modify process to reduce material use/cost $106,940 $8,000 - - $106,940
02 2.9114: Use solar heat to make electricty $51,928 $289,763 $51,928
444,970
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $17,284 $4,000 $17,284
148,106
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,788 $4,000 $6,788
58,165
kWh
- -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,446 $1,500 $2,839
24,325
kWh
$607
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,652 $3,850 $1,256
10,763
kWh
$396
-
kW-mo/yr
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,402 $1,500 $1,402
12,012
kWh
- -
08 2.6231: Utilize controls to operate equipment only when needed $293 $170 $293
2,511
kWh
- -
TOTAL RECOMMENDED $189,733 $312,783 $81,790
700,852
kWh
$1,003
-
kW-mo/yr
$106,940
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs