| Assessment Year | 2018 |
|---|---|
| Principal Product | Pre-fabricated metal buildings |
| NAICS | 332311: Prefabricated Metal Building and Component Manufacturing |
| SIC | 3448: Prefabricated Metal Buildings and Components |
| Sales Range | $50 M to 100M |
| # of Employees | 325 |
| Plant Area |
270,000
ft2
|
| Annual Production | 50,000
ton
|
| Production Hrs. Annual | 7,560
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $150,574 | 2,947,532 |
kWh
|
$0.051 |
| Electricity Demand | $76,162 | 11,078 |
kW-mo/yr
|
$6.88 |
| Electricity Fees | $1,902 | - |
|
- |
| TOTAL YEARLY COSTS | $228,638 | |||
| RECOMMENDED SAVINGS* | $89,050 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $57,980 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $29,830 | $29,090 |
$22,620
389,950
kWh
|
$7,210
-
kW-mo/yr
|
- | |
| 02 | 2.3212: Optimize plant power factor | $28,900 | $38,090 | - |
$28,900
-
kW-mo/yr
|
- | |
| 03 | 2.4133: Use most efficient type of electric motors | $11,800 | $11,610 |
$10,600
183,000
kWh
|
$1,200
-
kW-mo/yr
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $11,480 | $5,000 |
$8,700
150,000
kWh
|
$2,780
-
kW-mo/yr
|
- | |
| 05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,920 | $50 |
$1,910
33,000
kWh
|
$1,010
-
kW-mo/yr
|
- | |
| 06 | 2.4239: Eliminate or reduce compressed air usage | $2,170 | $115 |
$2,170
37,400
kWh
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,220 | $540 |
$150
2,620
kWh
|
$40
-
kW-mo/yr
|
$1,030 | |
| 08 | 2.6125: Keep equipment clean | $730 | $50 |
$575
9,940
kWh
|
$155
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $89,050 | $84,545 |
$46,725
805,910
kWh
|
$41,295
-
kW-mo/yr
|
$1,030 | ||
| TOTAL IMPLEMENTED | $57,980 | $46,340 |
$44,555
768,510
kWh
|
$12,395
-
kW-mo/yr
|
$1,030 | ||