ITAC Assessment: AM0762
ITAC logo
ITAC Assessment: AM0762
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Pre-fabricated metal buildings
NAICS 332311: Prefabricated Metal Building and Component Manufacturing
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $50
M
to 100
M
# of Employees 325
Plant Area 270,000
ft2
Annual Production 50,000
ton
Production Hrs. Annual 7,560
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $150,574 2,947,532
kWh
Electricity Demand $76,162 11,078
kW-mo/yr
Electricity Fees $1,902 -
TOTAL YEARLY COSTS $228,638
RECOMMENDED SAVINGS* $89,050 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,980

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $29,830 $29,090 $22,620
389,950
kWh
$7,210
-
kW-mo/yr
-
02 2.3212: Optimize plant power factor $28,900 $38,090 - $28,900
-
kW-mo/yr
-
03 2.4133: Use most efficient type of electric motors $11,800 $11,610 $10,600
183,000
kWh
$1,200
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,480 $5,000 $8,700
150,000
kWh
$2,780
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,920 $50 $1,910
33,000
kWh
$1,010
-
kW-mo/yr
-
06 2.4239: Eliminate or reduce compressed air usage $2,170 $115 $2,170
37,400
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,220 $540 $150
2,620
kWh
$40
-
kW-mo/yr
$1,030
08 2.6125: Keep equipment clean $730 $50 $575
9,940
kWh
$155
-
kW-mo/yr
-
TOTAL RECOMMENDED $89,050 $84,545 $46,725
805,910
kWh
$41,295
-
kW-mo/yr
$1,030
TOTAL IMPLEMENTED $57,980 $46,340 $44,555
768,510
kWh
$12,395
-
kW-mo/yr
$1,030
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs