ITAC Assessment: MZ0310
ITAC logo
ITAC Assessment: MZ0310
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Prefabricated Metal Buildings
NAICS 332311: Prefabricated Metal Building and Component Manufacturing
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 215,000
ft2
Annual Production 500
units
Production Hrs. Annual 4,160
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,224 881,028
kWh
Electricity Demand $17,414 2,785
kW-mo/yr
Electricity Fees $622 -
Natural Gas $23,699 4,867
MMBtu
Waste Disposal Costs
Water Usage $8,074 219
Tgal
TOTAL YEARLY COSTS $134,033
RECOMMENDED SAVINGS* $13,319 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.6218: Turn off equipment when not in use $6,274 $490 $6,274
65,624
kWh
- -
02 2.8115: Base utility charges on usage rather than area occupied $3,630 $1,160 - - $3,630
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,250 $2,580 - $2,250
-
kW-mo/yr
-
04 2.4239: Eliminate or reduce compressed air usage $1,165 $1,896 $1,069
11,178
kWh
$96
-
kW-mo/yr
-
TOTAL RECOMMENDED $13,319 $6,126 $7,343
76,802
kWh
$2,346
-
kW-mo/yr
$3,630
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs