ITAC Assessment: OD0138
ITAC logo
ITAC Assessment: OD0138
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Carpet and Automobile Padding
NAICS
n/a
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 50,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,435 1,634,525
kWh
Electricity Demand $39,031 6,887
kW-mo/yr
Electricity Fees $16,138 -
Natural Gas $26,166 3,157
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,313 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $11,813 $45,982 $9,727
247,069
kWh
$2,086
-
kW-mo/yr
- - -
02 2.7124: Make a practice of turning off lights when not needed $2,361 $1,100 $2,361
59,789
kWh
- - - -
03 2.4113: Install motor voltage controller on lightly loaded motors $858 $4,020 $538
13,775
kWh
$320
-
kW-mo/yr
- - -
04 2.7224: Reduce space conditioning during non-working hours $1,382 $400 $255
6,448
kWh
- $1,127
-
MMBtu
- -
05 3.6125: Sell combustible waste $15,574 - - - - $15,574
-
lb
-
06 4.821: Pay bills on time to avoid late fees $325 - - - - - $325
TOTAL RECOMMENDED $32,313 $51,502 $12,881
327,081
kWh
$2,406
-
kW-mo/yr
$1,127
-
MMBtu
$15,574
-
lb
$325
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs