Assessment Year | 2024 |
---|---|
Principal Product | Industrial Metal Buildings |
NAICS | 332311: Prefabricated Metal Building and Component Manufacturing |
SIC | 3448: Prefabricated Metal Buildings and Components |
Sales Range | $10 M to 50M |
# of Employees | 129 |
Plant Area |
120,000
ft2
|
Annual Production | 430
units
|
Production Hrs. Annual | 2,500
hrs
|
Location (State) | West Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $75,235 | 791,340 |
kWh
|
$0.095 |
Electricity Demand | $33,145 | 3,132 |
kW-mo/yr
|
$10.58 |
Electricity Fees | $7,727 | - |
|
- |
Natural Gas | $52,766 | 4,404 |
MMBtu
|
$11.98 |
TOTAL YEARLY COSTS | $168,873 | |||
RECOMMENDED SAVINGS* | $18,673 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7313: Recycle air for heating, ventilation and air conditioning | $11,346 | $19,500 |
$1,784
18,756
kWh
|
$952
-
kW-mo/yr
|
$9,860
-
MMBtu
|
$(-1,250.0) | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,679 | $5,920 |
$3,669
38,581
kWh
|
$2,010
-
kW-mo/yr
|
- | - | |
03 | 2.4224: Upgrade controls on compressors | $859 | $3,565 |
$478
5,022
kWh
|
$381
-
kW-mo/yr
|
- | - | |
04 | 2.4151: Develop a repair/replace policy | $445 | $1,367 |
$340
3,578
kWh
|
$180
-
kW-mo/yr
|
- | $(-75.0) | |
05 | 2.6231: Utilize controls to operate equipment only when needed | $260 | $640 |
$260
2,730
kWh
|
- | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $84 | $100 |
$52
552
kWh
|
$32
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $18,673 | $31,092 |
$6,583
69,219
kWh
|
$3,555
-
kW-mo/yr
|
$9,860
-
MMBtu
|
$(-1,325.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs