ITAC Assessment: SF0473
ITAC logo
ITAC Assessment: SF0473
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Pre-Engineered Metal Buildings
NAICS 332311: Prefabricated Metal Building and Component Manufacturing
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $50
M
to 100
M
# of Employees 157
Plant Area 100,000
ft2
Annual Production 16,500
ton
Production Hrs. Annual 6,884
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,867 1,284,226
kWh
Electricity Demand $52,330 4,277
kW-mo/yr
Electricity Fees $2,060 -
Natural Gas $726 53
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $173,347 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $161,559

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7224: Reduce space conditioning during non-working hours $7,057 - $6,866
47,188
kWh
- $191
-
MMBtu
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,181 - $2,709
18,616
kWh
- - $(-528.0) -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,523 $66 $1,311
9,011
kWh
$212
-
kW-mo/yr
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $951 $144 $951
6,538
kWh
- - - -
05 2.7135: Install occupancy sensors $3,208 $2,648 $2,224
15,284
kWh
$984
-
kW-mo/yr
- - -
06 2.4224: Upgrade controls on compressors $10,962 $10,585 $10,962
75,337
kWh
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $24,885 $76,232 $25,209
173,243
kWh
$3,191
-
kW-mo/yr
- $418 $(-3,933.0)
08 2.9114: Use solar heat to make electricty $121,903 $1,110,964 $121,903
837,763
kWh
- - - -
09 3.5315: Lease / purchase baler; sell cardboard to recycler $677 - - - - $677 -
TOTAL RECOMMENDED $173,347 $1,200,639 $172,135
1,182,980
kWh
$4,387
-
kW-mo/yr
$191
-
MMBtu
$567 $(-3,933.0)
TOTAL IMPLEMENTED $161,559 $1,197,925 $161,734
1,111,497
kWh
$3,191
-
kW-mo/yr
- $567 $(-3,933.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs