ITAC Assessment: OR0542
ITAC logo
ITAC Assessment: OR0542
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Steel building components
NAICS 332311: Prefabricated Metal Building and Component Manufacturing
SIC 3448: Prefabricated Metal Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 140,000
ft2
Annual Production 40
pieces
Production Hrs. Annual 4,450
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,835 1,612,600
kWh
Electricity Demand $14,550 5,450
kW-mo/yr
Electricity Fees $10,490 -
Natural Gas $82,911 7,571
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $154,596 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings
01 2.911: Solar $112,205 $783,772 $112,205
1,522,800
kWh
- -
02 3.212: Painting operations $31,122 $1,120 - - $31,122
-
gal
03 2.2437: Recover waste heat from equipment $3,350 $385 - $3,350
-
MMBtu
-
04 2.4133: Use most efficient type of electric motors $3,260 $6,902 $3,260
40,506
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,132 $9,045 $3,132
36,691
kWh
- -
06 2.6218: Turn off equipment when not in use $1,527 - $1,527
21,942
kWh
- -
TOTAL RECOMMENDED $154,596 $801,224 $120,124
1,621,939
kWh
$3,350
-
MMBtu
$31,122
-
gal
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs