| Assessment Year | 2003 |
|---|---|
| Principal Product | Fiberglass Boats |
| NAICS | 336612: Boat Building |
| SIC | 3732: Boat Building and Repairing |
| Sales Range | $50 M to 100M |
| # of Employees | 300 |
| Plant Area |
n/a
|
| Annual Production | 1,612
units
|
| Production Hrs. Annual | 0
hrs
|
| Location (State) | Oregon |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $112,202 | 2,627,680 |
kWh
|
$0.043 |
| Electricity Demand | $32,181 | 82,692 |
kW-mo/yr
|
$0.39 |
| Natural Gas | $6,956 | 1,048 |
MMBtu
|
$6.64 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $269,830 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $8,400 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Ancillary Material Cost Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,100 | $5,000 |
$3,300
97,000
kWh
|
$1,800
-
kW-mo/yr
|
- | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,300 | - |
$2,300
68,000
kWh
|
$1,000
-
kW-mo/yr
|
- | - | |
| 03 | 4.124: Install continuous lubrication equipment | $14,430 | $1,000 |
$(-470.0)
-
kWh
|
- | $14,900 | - | |
| 04 | 4.125: | $247,000 | $1,382,000 | - | - | - | $247,000 | |
| TOTAL RECOMMENDED | $269,830 | $1,388,000 |
$5,130
165,000
kWh
|
$2,800
-
kW-mo/yr
|
$14,900 | $247,000 | ||
| TOTAL IMPLEMENTED | $8,400 | $5,000 |
$5,600
165,000
kWh
|
$2,800
-
kW-mo/yr
|
- | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs