ITAC Assessment: OR0448
ITAC logo
ITAC Assessment: OR0448
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Fiberglass Boats
NAICS 336612: Boat Building
SIC 3732: Boat Building and Repairing
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area
n/a
Annual Production 1,612
units
Production Hrs. Annual 0
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $112,202 2,627,680
kWh
Electricity Demand $32,181 82,692
kW-mo/yr
Natural Gas $6,956 1,048
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $269,830 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,400

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,100 $5,000 $3,300
97,000
kWh
$1,800
-
kW-mo/yr
- -
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,300 - $2,300
68,000
kWh
$1,000
-
kW-mo/yr
- -
03 4.124: Install continuous lubrication equipment $14,430 $1,000 $(-470.0)
-
kWh
- $14,900 -
04 4.125: $247,000 $1,382,000 - - - $247,000
TOTAL RECOMMENDED $269,830 $1,388,000 $5,130
165,000
kWh
$2,800
-
kW-mo/yr
$14,900 $247,000
TOTAL IMPLEMENTED $8,400 $5,000 $5,600
165,000
kWh
$2,800
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs