Assessment Year | 1995 |
---|---|
Principal Product | hydraulic cylinders |
NAICS |
n/a
|
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
372,000
ft2
|
Annual Production | 10,000
pieces
|
Production Hrs. Annual | 4,420
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $664,814 | 14,995,311 |
kWh
|
$0.044 |
Natural Gas | $122,518 | 48,521 |
MMBtu
|
$2.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,043 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,032 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $9,679 | $39,996 |
$9,679
-
kWh
|
- | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,118 | $170 |
$7,118
169,109
kWh
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $914 | $408 |
$914
20,223
kWh
|
- | - | |
04 | 2.2437: Recover waste heat from equipment | $672 | $440 | - |
$672
-
MMBtu
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $466 | $50 |
$466
11,137
kWh
|
- | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,906 | $2,480 |
$2,906
69,168
kWh
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,650 | $4,513 |
$1,650
39,273
kWh
|
- | - | |
08 | 2.7135: Install occupancy sensors | $117 | $231 |
$117
2,638
kWh
|
- | - | |
09 | 2.1213: Direct warmest air to combustion intake | $887 | $700 | - |
$887
-
MMBtu
|
- | |
10 | 3.7115: Clean lines with "pigs" instead of solvents / solutions | $5,634 | $1,370 | - | - |
$5,634
-
lb
|
|
TOTAL RECOMMENDED | $30,043 | $50,358 |
$22,850
311,548
kWh
|
$1,559
-
MMBtu
|
$5,634
-
lb
|
||
TOTAL IMPLEMENTED | $8,032 | $578 |
$8,032
189,332
kWh
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs